Public Infrastructure
Public Infrastructure
Muir Woods Road Improvement Project
Document Stage
Environmental Review
Public comment period
Closed on May 22, 2026
The proposed improvements primarily consist of resurfacing, restoring, and rehabilitating the roadway. Improvements include replacing and realigning a substandard bridge over Redwood Creek; formalizing a segment of the Redwood Creek Trail along the roadway; stabilizing the roadway embankment in areas of slope failure; and implementing drainage improvements consisting of culvert repair, culvert replacement, and culvert outfall protection. The Proposed Project would also include signing and stripi...
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.