Beaumont Master Drainage Plan Line 2, Stage 1
Begin at E 6th St and Chestnut and terminate at E 1st St and Berkshire Ave, Beaumont, California 92223
Begin at E 6th St and Chestnut and terminate at E 1st St and Berkshire Ave, Beaumont, California 92223
Document Stage
Environmental Review
Public comment period
Closed on July 9, 2026
Description
The Proposed Project would construct approximately 5,000 linear feet of 84-inch to 102-inch RCP along 6th St, Pennsylvania Ave, and E 1st St in the City to handle anticipated future flows. Manholes would be constructed for maintenance access at intervals of no more than 500 feet at the end of each line. Additional components to be installed include inlets and outlets to facilitate efficient entry and exit from the system. The RCP would feature grated openings to prevent the accumulation of debri...