Public Infrastructure

Fender Replacement and Maintenance at Berth B76 and B77– Harbor Development Permit No. 26-010

Long Beach, California

Document Stage

Post-Decision

Description

In-kind replacement of a total of nine 9 timber piles approximately 80 feet long and 16 inches in diameter, with six 6 timber piles located at Berth B76 and three 3 located at Berth B77, using a vibratory hammer and crane staged on a 150-feet long by 50-feet wide barge. Maintenance work includes installation and repair of pile wrap and repair of wooden walers.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.