Solar

Solar Infrastructure and Battery Energy Storage System Project

Cottonwood Loop, Merced, California 95343

Document Stage

Environmental Review

Public comment period

Closed on July 15, 2026

Description

The project would include the demolition of an existing 1-megawatt MW ground-mounted solar array facility, and the construction of an up to 6-MW solar facility consisting of a dual-axis tracking system and a new battery energy storage system BESS with a minimum storage capacity of 3 megawatt-hour MWh. The project would interconnect to the UC Merced campus’ existing distribution system and power grid via the existing gen-tie line. The project would be served by existing water distribution infrast...