Public Infrastructure

Guadalupe River Bridge Replacement Project

Willow St, Delmas Ave, Virgina St, Mclellan Ave, San Jose, California 95110

Document Stage

Post-Decision

Approval Date

May 29, 2026

Description

Caltrain operates on two tracks over the Guadalupe River in San Jos&233;. The northbound track is on a wooden trestle bridge constructed in 1935 and the southbound track is on a concrete bridge constructed in 1990. To address safety issues and protect the bridges, the 187-foot northbound bridge will be replaced with a new, 265-foot concrete bridge; the southbound bridge extended by 90 feet, and the channel widened by approx. 75 feet to create a connection to the existing Santa Clara Valley Water...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.