Public Infrastructure
Public Infrastructure
Guadalupe River Bridge Replacement Project
Willow St, Delmas Ave, Virgina St, Mclellan Ave, San Jose, California 95110
Willow St, Delmas Ave, Virgina St, Mclellan Ave, San Jose, California 95110
Document Stage
Post-Decision
Approval Date
May 29, 2026
Description
Caltrain operates on two tracks over the Guadalupe River in San Jos&233;. The northbound track is on a wooden trestle bridge constructed in 1935 and the southbound track is on a concrete bridge constructed in 1990. To address safety issues and protect the bridges, the 187-foot northbound bridge will be replaced with a new, 265-foot concrete bridge; the southbound bridge extended by 90 feet, and the channel widened by approx. 75 feet to create a connection to the existing Santa Clara Valley Water...
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.