Public Infrastructure

Electrical Rubber-Tired Gantry (eRTG) Crane Runway Construction & Installation of Electrical Infrastructure

Long Beach, California

Document Stage

Post-Decision

Description

Extension of four existing concrete runways, approximately 5-feet wide and 910-feet long, on Pier J South and construction of four new runways, each 6-feet wide and 1,540-feet long, on Pier J North to accommodate the arrival of four new electrified rubber-tired gantries eRTG. The project also involves installation and connection of eRTG electrical infrastructure from the runways to existing substations within the terminal.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.