Wilson Creek Restoration and SPGA Wall Project
U.S. Highway 101 from postmile 12.6 to 13.2, Klamath, California 95548
U.S. Highway 101 from postmile 12.6 to 13.2, Klamath, California 95548
Document Stage
Post-Decision
Approval Date
Jul 7, 2026
Description
The project proposes to stabilize the roadway from PM 12.69 to PM 12.95 with a modified alignment and construction of retaining walls. Two retaining walls would be constructed to stabilize the roadway beginning at the north end of the Wilson Creek Bridge: a 695-foot-long by 55-foot-high solider pile ground anchor SPGA wall along the western shoulder below the highway, and a 595--foot-long by 19-foot-high soil nail wall SNW along the eastern shoulder. From parent project: Approximately 1,400 feet...