Electrical
Electrical
Permit No. 20098– Authorize Existing Poles 5/91 and 5/90
Stockton, California
Stockton, California
Document Stage
Post-Decision
Description
To authorize pole 5/91 and pole 5/90 on the Weber-Mormon Junction 60kV electric transmission line that was constructed in 1953, before the adopted plan of flood control “Operation and Maintenance Manual for Mormon Slough Project San Joaquin County, California, Part No.I-Levees and Channels, San Joaquin River to Bellota, 1967”. This is an aerial crossing with the poles located on the landside.
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.