Electrical

Permit No. 20098– Authorize Existing Poles 5/91 and 5/90

Stockton, California

Document Stage

Post-Decision

Description

To authorize pole 5/91 and pole 5/90 on the Weber-Mormon Junction 60kV electric transmission line that was constructed in 1953, before the adopted plan of flood control “Operation and Maintenance Manual for Mormon Slough Project San Joaquin County, California, Part No.I-Levees and Channels, San Joaquin River to Bellota, 1967”. This is an aerial crossing with the poles located on the landside.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.