Water

Emergency Repair of Pipeline 3 (R0350)

Cerro Del Sur and I-15, San Diego, California

Document Stage

Post-Decision

Description

Surface water was detected and the source was determined to be treated water from Pipeline 3 – a 66-inch steel pipe which is part of the Water Authority’s Second Aqueduct. The project will include excavation and replacement of the steel pipe sections. Staging, excavation and construction will occur within the Water Authority’s easement.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.