Water

Pearblossom Concrete Pad Replacement (OM-SFD-2026-003)

116th Street E, Pearblossom Hwy, Pearblossom, California

Document Stage

Post-Decision

Description

Department of Water Resources DWR and Contractor will demolish and remove an existing concrete pad and pour a new pad of the same size for a KYB Transformer at the Pearblossom Pumping Plant. The concrete pad will be 24 feet x 28 feet x 18 inches high poured by concrete truck. The sub surface will be excavated to approximately 36 inches to make room for a 48 inch thick seismically stable pad. All access and work is within DWR right of way.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.