Water

SILVER GATE TUNNEL ABANDONMENT PROJECT

BELT STREET AND SAMPSON STREET, San Diego, California 92113

Document Stage

Post-Decision

Approval Date

Jul 6, 2026

Description

The Project will place a temporary cofferdam deployed along approximately 55 linear feet LF of existing rock revetment at two separate locations for a total of approximately 110 LF of shoreline. Two intake/discharge shoreline structures will be demolished and the material reused for the existing rock revetment adjacent to intake/discharge structures matching the existing material and slope. The work will take place between Mean Lower Low Water MLLW and Mean Higher High Water MHHW elevations with...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.