Electrical

Power the South Bay Project

Multiple: Weber Rd, Boyce Rd, Cushing Pkwy, Fremont Blvd, Los Esteros Rd, Disk Dr, Lafayette St, Fremont, San Jose, California

Document Stage

Post-Decision

Approval Date

Jul 28, 2026

Description

Installation and use of 230-kilovolt kV electrical cables, communication lines, and ground continuity cables located within various conduits to be installed using surface trenching and horizontal directional drilling HDD, a communication handhole, and vault. The State Lands Commission action is approval of a 20-year General Lease – Right-of-Way Use through July 2046. From parent project: The Power the South Bay Project would augment the reliability of a CAISO-controlled grid located in the citie...