Water

Well 34 and Well 19 Wellhead Treatment Project (Project)

e/o Palo Verde St. & Camulos Ave, Montclair, CA (APN: 1009-182- 11), Montclair, California

Document Stage

Post-Decision

Description

The Project consists of water treatment system improvements to Well 34 and Well 19. The project includes excavation, addition of ~10,586 square feet of concrete pads, the installation of four GAC vessels to treat for 1,2,3-TCP followed by two IX structures to treat for nitrate, 6 aboveground storage tanks 2 brine tanks and 4 waste tanks, the reconfiguration of the well discharge piping, additional site lighting, and the backfilling of soil to restore the ground level at the existing Well 34 site...

Sign in or create a FREE account