Water
Water
Dale-Scott Weir Project
Merced River – River Mile - 27.85, Snelling, CA., Snelling, California
Merced River – River Mile - 27.85, Snelling, CA., Snelling, California
Document Stage
Post-Decision
Description
The overall goal is to reconstruct a gravel weir structure to allow for directing surface flow into the Dale-Scott Ditch Weir system. Once constructed, the weir is eventually overtopped by flow after water is backed up behind the weir. Over time and higher flows, the rock gravel is naturally distributed downstream. All rock/gravel would be placed below the Ordinary High Water Mark which is estimated to be 259 feet. From parent project: The California Department of Fish and Wildlife has executed...
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.