Public Infrastructure

Wastewater Treatment Plant Pavement Rehabilitation Project

Sherritt Lane and Donner Pass Road, unincorporated Soda Springs, California 95728

Document Stage

Post-Decision

Description

Rehabilitate approximately 21,000 square feet of the existing asphalt concrete pavement by cold plane grinding the existing surface to a depth of 0.17 foot 2-inches, and constructing a 2-inch 0.17 overlay of fiber-reinforced hot mix asphalt FRMA. Construct repairs up to a 4-inch maximum depth at limited locations of about 500 square feet. Project benefits DSPUD customers.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.