Public Infrastructure
Public Infrastructure
HM-1 Route 22 and Route 57 Cold plane & replace RHMA
Anaheim, Orange, California
Anaheim, Orange, California
Document Stage
Post-Decision
Description
This project proposes to remove a depth of 0.10’ of existing asphalt pavement by cold plane and replace with Rubberized Hot Mix Asphalt RHMA at various on and off ramps on Route 22 from 1 mile west of Bristol St UC to Route 22/5 Separation and Route 57 from 57/5 Separation to 0.3 mile north of Lincoln Ave UC. Proposed work will also include upgrading existing curb ramps to current standards, pavement delineation, rumble strips, and electrical loop replacement. No vegetation removal will occur. N...
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.