Natural Resource Management

Mojave Fish Hatchery -Water Well and Booster Station Equipment Upgrade

Victorville, California

Document Stage

Post-Decision

Description

The Water Well and Booster Station Equipment upgrade will replace equipment that has reached the end of it useful life at the Mojave Fish Hatchery. The project activities include: • Remove the existing propane tank and associated concrete pad; • remove, grade to existing, and replace the 2’ wide by 70’ long gravel road; • remove, grading to existing, and replace 2’ wide by 72’ asphalt pavement • remove existing bollards • Excavate approximately 20’ by 8’-2” by 24” to construct a new concrete pad...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.