Public Infrastructure

Richards Boulevard Drainage Improvements Project

Sacramento, California 95811

Document Stage

Post-Decision

Description

The project would improve transportation and reduce flooding in the Basin 111 around Richards Boulevard between Sequoia Pacific Boulevard and North 5th Street. The project would include the installation of 700 linear feet of 54-inch Drainage pipe on Richards Boulevard, between Sequoia Pacific Boulevard and North 5th Street. The project would require that PG&E relocate 400 linear feet of gas main two feet over from its existing location within the existing right-of-way to accommodate the new drai...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.