Wilson Creek Restoration and SPGA Wall Project
U.S. 101 from postmile 12.6 to 13.2, Klamath, California
U.S. 101 from postmile 12.6 to 13.2, Klamath, California
Document Stage
Post-Decision
Approval Date
Aug 20, 2026
Description
Restore the roadway to pre-storm conditions on US 101 in Del Norte County, from Post Miles 12.6 to 13.2. Specifically, stabilize the roadway with a modified alignment and construction of retaining walls, including a soldier pile ground anchor SPGA wall. From parent project: The project proposes to stabilize the roadway from PM 12.69 to PM 12.95 with a modified alignment and construction of retaining walls. Approximately 1,400 feet of U.S. 101 would be realigned immediately north of the Wilson Cr...