Public Infrastructure

Minor Alteration No. WA2026103– Milepost 239.83 Bridge Repair Project

Cottonwood, California

Document Stage

Post-Decision

Description

To repair scour damage to the footer of pier 6 of the existing Milepost 239.83 Bridge. Repair consists of installing sheet-pile forms surrounding the 8-foot by 22-foot pier 6 and backfilling the scour hole with controlled low strength material. Two existing abandoned piers and associated sheet-pile cofferdams from a previous bridge, each approximately 12 feet by 24 feet, will also be removed to three feet below the natural groundline within the Cottonwood Creek Channel. The remainder of the proj...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.