Oil and Gas
Oil and Gas
826826_45200001_PGE_UGS
Stockton, California
Stockton, California
Document Stage
Post-Decision
Description
PG&E plans to rework two wells to meet CalGEM Underground Gas Storage inspection and construction requirements as specified in 14 CCR &167; 1726. The proposed scope of work includes the following activities: retrieve existing tubing string and packer, retrieve production liner, perform casing integrity wireline surveys, replace existing wellhead, install new production liner and gravel pack, and install new tubing string and packer. The proposed project will require, at a minimum, the following...
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.