Oil and Gas

826826_45200001_PGE_UGS

Stockton, California

Document Stage

Post-Decision

Description

PG&E plans to rework two wells to meet CalGEM Underground Gas Storage inspection and construction requirements as specified in 14 CCR &167; 1726. The proposed scope of work includes the following activities: retrieve existing tubing string and packer, retrieve production liner, perform casing integrity wireline surveys, replace existing wellhead, install new production liner and gravel pack, and install new tubing string and packer. The proposed project will require, at a minimum, the following...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.