Earthwork and Grading

Bethany Pipe Drain Erosion Repair (OM-DFD-2026-014)

Christensen Rd, Kelso Rd, California Aqueduct Bikeway, Mountain House, California

Document Stage

Post-Decision

Description

Department of Water Resources DWR staff will repair a large erosion along the eastern slope of the parking area at Bethany Reservoir. The erosion will be repaired by collapsing loose, eroded soil on the slope and excavating to allow for rip rap placement. The erosion area will then be filled with 8-10 inch rip rap. The erosion also washed out some of the adjacent toe road, so gravel will be added to the top of road as needed. All access and work will be within the DWR right-of-way.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.