Water

Devil’s Den Pipeline Visual Inspection

Lost Hills, California

Document Stage

Post-Decision

Description

The Department of Water Resources DWR plans to inspect the Devil’s Den pipeline DEPL. To safely inspect the line, the pipe will first be fully drained. To assist with dewatering, DWR will use 4-inch lay flat PVC to transfer water from the DEPL to the Berrenda Mesa canal. Lay flat pipe will connect to a portable diesel pump at vault 16.70. DWR workers will run the lay flat pipe uphill towards vault 16.60, approximately 535-feet away, and then downhill towards Kecks Rd, approximately 1,440-feet aw...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.