Oil and Gas

813320_45200001_PGE_UGS

2540' S & 3187'W of N.E. Corner Sec 25, Stockton, California

Document Stage

Post-Decision

Description

PG&E plans to rework one well to meet CalGEM’s Underground Gas Storage inspection and construction requirements as specified in 14 CCR &167; 1726. The proposed scope of work includes the following activities: retrieve existing tubing string, perform casing integrity wireline surveys, and install new tubing string. The proposed project will require, at a minimum, the following equipment: workover rig double, mud pumps, cuttings bin, blowout prevention equipment and accumulator, generator, fuel ta...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.