Public Infrastructure

Breach Gate and Interior Flooring Replacement – CAMI-2024-0012

Kirk Douglas Way, Palm Springs, California 92262

Document Stage

Post-Decision

Description

The project involves replacing the existing flooring and breach gate system within the Wexler Main Terminal at Palm Springs International Airport PSP. The existing flooring will be replaced with terrazzo featuring a contemporary interpretation of the terminal’s original design. The project also includes replacing the existing revolving door system used by passengers exiting the airport’s secure area with a new breach gate system.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.