Public Infrastructure
Public Infrastructure
PLER2025-00150 SMF Fuels Terminal A Fueling Station
Document Stage
Environmental Review
Public comment period
Open until December 1, 2026
The Sacramento International Airport SMF currently performs into-plane ITP fueling at Terminal A via refueler trucks that must cross runways and taxiways from the existing tank farm. The project proposes the construction of a refueler truck loading facility with the capacity to fuel two refueler trucks at the same time, installation of approximately 5,750 feet of 12-inch transfer main pipes, approximately 200 feet of 14-inch instrument valve system IVS line, and 2,300 feet of 16-inch Jet-A pipin...
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.