Electrical

Power Santa Clara Valley Project

Coleman Ave and Highway 87, San Jose, California 95110

Document Stage

Post-Decision

Approval Date

Oct 26, 2026

Description

The Approved Project consists of two new high-voltage direct current HVDC terminals, an approximately 11.8-mile underground transmission line connecting the new HVDC terminals, and an approximately 100-foot overhead transmission tie line to connect one of the new HVDC terminals to the existing PG&E San Jose B Substation. Since the Approved Project’s Grove HVDC Terminal site is directly adjacent to the PG&E Metcalf Substation modification area, the overhead Metcalf to Grove 500 kV transmission ti...