Public Infrastructure

Teerink Pumping Plant Electric Vehicle Supply Equipment Install

B Road and Wheeler Ridge Access Road, Mettler, California

Document Stage

Post-Decision

Description

Department of Water Resources DWR and Contractor will install electrical vehicle supply equipment to provide power to ten electric vehicle charging station ports. Installation of fixed bollards, wheel stops, buried conduits, and wiring will be done with pavement saw cutting, trenching, backfilling, and finishing of affected lot surface restored to original condition. Electrical power will be supplied by connection to existing electrical source provided at the site. All work will be in previously...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.