Solar
Solar
UC Merced Solar Infrastructure and Battery Energy Storage System Project
Bellevue Road and Cottonwood Loop, Merced, California 95343
Bellevue Road and Cottonwood Loop, Merced, California 95343
Document Stage
Post-Decision
Approval Date
Nov 10, 2026
Description
The project would include the demolition of an existing 1-megawatt MW ground-mounted solar array facility, and the construction of an up to 6-MW solar facility consisting of a dual-axis tracking system and a new battery energy storage system BESS with a minimum storage capacity of 3 megawatt-hour MWh. The project would interconnect to the UC Merced campus’ existing distribution system and power grid via the existing gen-tie line. The project would be served by existing water distribution infrast...
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.