Telecommunications

Permit No. 20139 Antioch Bridge Middle Mile Broadband Conduit Installation Project

Antioch, Sacramento, California

Document Stage

Post-Decision

Description

To install 9,568 linear feet lf of a seven-way conduit and a 1.25-inch conduit. Approximately 9,512 lf of the conduits will be encased within four-inch schedule 40 PVC pipe above ground and attached to the internal super structure of the Antioch Bridge Bridge which traverses over the Mayberry Slough and the San Joaquin River which are both Board regulated streams. The remaining 56 lf of conduits will be encased in four-inch diameter high-density polyethylene extruded pipe HDPE trenched at both e...

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.