Public Infrastructure

Bay Terraces/Skyline South Storm Drain Replacement

San Diego, California

Document Stage

Post-Decision

Description

The purpose of the project is to remove and replace an existing storm drain pipe Pipe 31721 with a new concrete pipe, including removal and replacement of the existing headwall. The pipe is located within an earthen unvegetated drainage D-1 between steep vegetated slopes.

Sign in or create a FREE account

Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.