Public Infrastructure
Public Infrastructure
New Dock Street Pump Station System for Groundwater Diversion – Harbor Development Permit No. 26-026
Long Beach, California
Long Beach, California
Document Stage
Post-Decision
Description
Level I HDP 26-026 permits the Port of Los Angeles to construct a new pump station with connection to electrical service at Pier S, on New Dock Street, west of Henry Ford Avenue to pump groundwater from an existing storage vault to a nearby sewer connection approximately 1,700 to 2,000 linear feet away. The existing storage vault with structural modifications to accommodate the pump and serve as a wet well. A new dry well will be installed adjacent to the wet well to house check valves and shut-...
Sign in or create a FREE account
Access the full proposal, agency contacts, alerts, and community sentiment so you can make your voice heard.